Ongoing KCCA LOT 1 works in progress – installation of precast concrete drainage sections
View Image
2025 – Ongoing ~3.50 km
Construction & Upgrade of Selected Roads in KCCA – LOT 1

Upgrade to asphalt standard of Ben Kiwanuka Rd, Rashid Khamis Rd & Old Kampala / Matia Mulumba Rd including drainage, walkways, markings & safety features.

Client: Kampala Capital City Authority (KCCA)

Scope: Demolition of failed sections, earthworks, new pavement structure with asphalt surfacing, lined side drains, culverts, pedestrian walkways, road markings, traffic signage, junction improvements, utility adjustments & traffic management.

Importance: Enhances traffic flow in Kampala's CBD and reduces congestion.

Aims: Improve road safety, support business activity, and provide durable urban road infrastructure.
World Bank- KCCA
Ongoing Mukono Municipality Roads LOT 3 – asphalt road with guardrails, markings and solar street lighting
View Image
2025 – Ongoing 9.72 km
Mukono Municipality Roads – LOT 3 (9.72 km)

Under the World Bank–funded Greater Kampala Metropolitan Area Urban Development Program (GKMA-UDP) — construction of Nasuuti–Nakabago–Ntawo, Bajjo–Seeta, Serado Link & Kigunga Link roads to asphalt standard with full drainage and safety installations.

Programme: The Greater Kampala Metropolitan Area Urban Development Program (GKMA-UDP)
Project: Construction of Selected Roads in Mukono Municipality LOT 3 – Nasuuti–Nakabago–Ntawo, Bajjo–Seeta, Serado Link, Kigunga Link (9.72 km)
Client: Mukono Municipal Council
Funding: The World Bank

Scope: Site clearance, earthworks, formation preparation, pavement layers up to asphalt concrete surfacing. Culverts, cross-drainage, side drains, road lighting, road markings, signage, pedestrian walkways & traffic calming.

Importance: Improves transport efficiency, reduces travel time, and supports socio-economic development within Mukono Municipality as part of the wider Greater Kampala metropolitan area.

Aims: Deliver climate-resilient urban roads, improve connectivity and safety for motorists and pedestrians, and boost local business and job opportunities.
World Bank · GKMA-UDP
Ongoing Namugongo–Misindye–Seeta Road – bitumen spraying ahead of asphalt overlay
View Image
2026 – Ongoing 6 km
Maintenance Repairs of Namugongo–Misindye–Seeta Road (6 km)

Maintenance and rehabilitation of the Namugongo–Misindye–Seeta corridor — repair of damaged sections followed by a new asphalt concrete overlay, shoulder repairs & concrete kerbing.

Scope: Repair of selected damaged road sections (pothole patching, base and pavement repairs) prior to overlay, asphalt concrete overlay, shoulder repairs, concrete kerbing and ancillary works including drainage clearing, road markings & signage.

Importance: Restores a key link between Namugongo, Misindye and Seeta, serving fast-growing residential and commercial areas between Kampala and Mukono.

Aims: Extend the road's service life, improve riding quality and safety, and reduce travel time and vehicle operating costs for road users.
Ministry Of Works and Transport – MOWT
Ongoing Lower Konge Road – concrete pouring for reinforced drainage structure
View Image
2025 – Ongoing Framework Contract
Completion Works on Lower Konge Road

Carried out under KCCA's Framework Contract for Roads and Drainage Element Repairs under DETS — completing the reconstruction of Lower Konge Road to asphalt standard with improved drainage and walkways.

Client: Kampala Capital City Authority (KCCA) – Directorate of Engineering & Technical Services (DETS)

Contract No.: KCCA/WRKS/24-2500132
Call-off Order: KCCA/WRKS/2025-2026/00750

Scope: Completion of road pavement layers up to asphalt concrete surfacing, repair and construction of drainage elements (lined side drains, culverts), kerbing, pedestrian walkways, road markings, signage & ancillary works.

Importance: Completes a key neighbourhood link road, improving access for residents, businesses and public transport.

Aims: Deliver a durable, well-drained road, reduce flooding and road damage, and improve safety for motorists and pedestrians.
KCCA
Ongoing Kampala Northern Bypass
View Image
2023 – Ongoing 21 km
Kampala Northern Bypass – Phase 1 (21 km)

Routine and periodic maintenance to preserve this strategic national bypass — pavement repairs, asphalt resurfacing, drainage maintenance & safety improvements.

Client: Ministry of Works & Transport

Scope: Pavement repairs, milling and replacement of distressed asphalt layers, sealing of cracks, pothole patching, improvement of road shoulders, drainage inspection/repair, road markings, guardrails & signage rehabilitation.

Importance: Preserves a strategic national bypass. Reduces vehicle operating costs and maintains uninterrupted traffic flow.
Ministry Of Works and Transport – MOWT
Completed Mwanga II Road
View Image
2022 – 2023
Reconstruction of Mwanga II Road & Kisenyi Lane

Full reconstruction including asphalt surfacing, comprehensive drainage improvements, pedestrian walkways & traffic safety installations.

Client: KCCA

Scope: Removal of failed pavement, earthworks, new pavement structure with asphalt surfacing, lined side drains, cross culverts, pedestrian walkways, traffic signage, road markings, traffic calming & utility coordination.

Importance: Upgraded deteriorated inner-city roads. Improved accessibility, sanitation, and traffic safety in central Kampala.
KCCA
Completed Nabulagala Road
View Image
Completed Kampala
Reconstruction of Nabulagala Road

Road rehabilitation works focused on pavement strength, improved drainage systems, and long-term serviceability for this busy urban corridor.

Client: KCCA

Scope: Road rehabilitation — pavement reconstruction, drainage improvements, road markings & safety features.

Importance: Restored structural integrity of an urban road, improving access and safety for commuters and residents.
KCCA
Completed Lukuli Road
View Image
2020 – 2023 Lukuli, Kampala
Recycling & Overlay of Lukuli Road (LOT 3)

Cold recycling of existing pavement layers, new asphalt overlay, junction signalization & drainage improvements to restore structural integrity.

Client: KCCA

Scope: Cold in-place pavement recycling, road base strengthening, asphalt concrete overlay, junction signalization, drainage improvements & road safety features.

Importance: Restored road integrity on a busy corridor. Extends pavement life, reduces maintenance costs, and enhances safety.
KCCA
Completed Jinja Municipal Roads
View Image
2020 Jinja
Rehabilitation of Jinja Municipality Roads

Rehabilitation of key municipal road networks across Jinja to improve connectivity, road safety, and surface durability.

Client: Jinja Municipal Council

Scope: Pavement rehabilitation, drainage improvements, road markings, signage & safety features.

Importance: Improved road condition for a major eastern Uganda town, reducing vehicle operating costs and enhancing safety.
Jinja Municipal Council
Completed New Nile Bridge
View Image
Completed Jinja
Asphalt Works on New Nile Bridge

Specialized asphalt surfacing executed on one of Uganda's most critical national infrastructure assets — the New Nile Bridge.

Client: UNRA

Scope: Specialized asphalt concrete surfacing on bridge deck, approach roads & safety features.

Importance: Ensured durable, safe surfacing on a key national asset connecting eastern Uganda.
UNRA
Completed Muwafu Road 1, Central Division – reconstructed asphalt road with kerbs and paved walkways
View Image
2024 – 2025 Central Division, Kampala
Reconstruction of Muwafu Road 1 – Central Division

Carried out under KCCA's Framework Contract for Road and Drainage Element Repairs — full reconstruction of Muwafu Road 1 to asphalt standard with kerbs, paved walkways, drainage & road markings.

Client: Kampala Capital City Authority (KCCA)

Contract No.: KCCA/WRKS/22-23/00028
Call-off Order: KCCA/WRKS/2024-2025/00402 – Construction of Roads and Bridges

Scope: Reconstruction of the road pavement up to asphalt concrete surfacing, drainage works, concrete kerbing, paved pedestrian walkways, road markings, signage & ancillary works.

Importance: Provides a durable, well-drained city road in Kampala's Central Division, improving access to homes and businesses.

Aims: Improve riding quality and safety for motorists and pedestrians, reduce flooding and road damage, and enhance the urban environment.
KCCA
Completed NMT Namirembe Road
View Image
2016 – 2020 Kampala
Non-Motorised Transport (NMT) – Namirembe Road

Development of pedestrian walkways, cycling lanes, crossings & safety features to promote safe and inclusive urban mobility.

Client: KCCA

Scope: Pedestrian walkways, cycling lanes, crossings, signage & safety features within existing urban corridors.

Importance: Encouraged walking and cycling, reduced accidents, and improved accessibility for vulnerable road users.
KCCA
Completed Festo-Kiziri Road
View Image
Completed Kampala
Lot 4: Festo – Kiziri Road

Construction of urban road infrastructure aimed at improving community access and traffic efficiency in the Festo–Kiziri corridor.

Client: KCCA

Scope: Road construction, drainage, pedestrian access & road safety features.

Importance: Improved connectivity for residents, supporting urban development and reducing congestion.
KCCA
KCCA UNRA Ministry of Works & Transport Municipal Councils